E-signing for construction and trades.
Construction paperwork gets signed in odd places: a tailgate, a site trailer, a coffee shop between jobs. The work does not stop for a document, so documents that wait for an office tend to get signed late or not at all. SignAndGo is built so that a foreman, a subtrade or a homeowner can sign on whatever device they have, and the office still ends up with a complete record.
The documents that keep a job moving
- Subcontract agreements and purchase orders with subtrades and suppliers.
- Change orders and variations agreed on site.
- Quotes and renovation contracts signed by homeowners.
- Safety orientation acknowledgements for workers arriving on a new site.
- Daily sign-offs, inspection checklists and completion certificates.
- Lien waivers and statutory declarations at the end of a payment cycle.
Why construction paperwork stalls
The person who needs to sign is usually busy with their hands. A subtrade means to sign the subcontract but the email is buried under supplier invoices. A homeowner verbally agrees to move a wall and then disputes the cost months later because nothing was signed. Safety orientations are collected on paper forms that get wet, lost or left in the truck.
Project managers also need to control what goes out. A subcontract with the wrong scope attached creates a problem that no signature fixes.
Features that suit site work
- Signing on any device. Subtrades and homeowners open a link on a phone and sign with a finger, with no account and nothing to install.
- Approvers before sending. A project manager or estimator can approve a subcontract or change order before it reaches the subtrade.
- Bulk send. Send the same site orientation acknowledgement to every worker on a crew at once, each signing their own copy.
- Conditional fields. Show extra questions only when they apply, such as asking for details if a worker answers that they hold a particular ticket.
- In-person signing. Hand a tablet to a homeowner at the kitchen table and let them sign a change order there and then.
- Reminders. Automatic reminders keep chasing a subtrade so the site supervisor does not have to.
- Large documents. Project manuals and specifications running to hundreds of pages can travel with the contract.
Sending from Procore
If your company runs projects in Procore, SignAndGo has a connection for sending subcontracts and commitments from Procore for signature, so the project team does not have to download and re-upload the document. It is in Procore's certification review and can be connected to a live Procore account once Procore approves it. The Procore integration page and the subcontractor signing page explain how it is set up.
A worked example: a basement renovation in Calgary
This contractor is invented for illustration. A small renovation company in Calgary is finishing a basement. Halfway through, the homeowners ask to add a bathroom rough-in, which changes the price and the schedule.
- The site lead writes up the change order in the company's own Word template on the office laptop that evening.
- The owner of the company is set as an approver before signing, so he checks the price before the homeowners see it.
- Both homeowners are signers, set to sign at the same time, with initials beside the revised completion date and a signature and date at the end.
- The plumbing subtrade's office is copied in so they know the work is confirmed.
- The owner approves from his phone the next morning, and the homeowners sign before lunch.
- The signed change order, with its audit certificate, is filed against the job. If the cost is questioned later, the record shows exactly what was agreed and when.
Documents that may need extra formality
In Canada, federal and provincial electronic commerce laws generally give electronic signatures the same effect as handwritten ones for most business documents. The documents that are excluded vary by province, and often include wills, powers of attorney and some land transfers. Check with your adviser which of your documents can be signed electronically.
In construction, watch for statutory declarations and any document that must be sworn before a commissioner or notary, and for anything registered against land. Some owners and public bodies also set their own signing requirements in their contracts. Read the contract and ask your lawyer before assuming a document can go electronically.
A sensible first project
Start with change orders. They are short, frequent and the most likely to cause a dispute when left unsigned. Then add safety orientations through bulk send, and finally move subcontracts across, with an approver on each. See how it works for the basic steps.
Frequently asked questions
- Can a subtrade sign on a phone on site?
- Yes. They open the link in a web browser on any device and sign with nothing to install.
- Can I send subcontracts from Procore?
- Yes. A connection for sending subcontracts and commitments from Procore is in Procore's certification review. Until it opens, export the subcontract from Procore and send it from SignAndGo.
- Can every worker on a crew sign the same safety acknowledgement?
- Yes. Bulk send sends one document to many people, and each person signs their own copy.
- Can statutory declarations be signed electronically?
- Documents that must be sworn or notarized often need extra formality, and the rules vary by province. Check with your adviser.
See SignAndGo for your team
Send your first envelope in a few minutes, and keep every signed copy with its audit trail.
See how it works