A contract administrator's guide to subcontractor signing.

Getting a subcontract signed is rarely hard in principle. In practice it stalls: the wrong person at the subcontractor receives it, a page is missed, or it sits unsigned while work starts. This guide is for the people who manage that process day to day, using SignAndGo with Procore.

Status: the Procore connection is built and working in Procore's test environment, and it is in Procore's certification review. It can be connected to a live Procore account once Procore approves it. Email privacy@myandgo.ai to be told when it opens.

Who signs for the subcontractor?

The single most common delay is sending the contract to someone who cannot sign it. Before sending, confirm the name and email address of the person authorized to sign for the subcontractor, which for a small firm may be the owner and for a larger one a director or officer. A site supervisor is usually the wrong person, however helpful. Ask the question once, record the answer against the company, and you avoid a week of forwarding.

Preparing the document

  • Signature and date on the execution page for each party.
  • Initials on pages where your process requires them, such as pages with negotiated changes.
  • Text fields for details you need back, such as the subcontractor's insurance policy number.
  • Checkboxes to confirm that schedules, safety requirements or site rules have been received.
  • Conditional fields for questions that only apply sometimes, such as details needed only when the subcontractor uses its own subcontractors.

The AI assistant can suggest where fields belong, which is a useful starting point on a long contract, but always check its suggestions before sending.

Setting the order

Use sequential signing so the subcontractor signs before your countersignatory. That way your authorized signatory only signs a document that is already accepted. Add an approver before signing if your process needs a commercial check, or a final approval after signing if a director must confirm the executed contract. CC the project manager and site lead so they receive the completed copy without needing to sign.

Chasing without the phone

  1. Turn on automatic reminders when you send, so subcontractors are followed up without you remembering to do it.
  2. Check the envelope status to see whether the subcontractor has opened the document at all. An unopened envelope often means the wrong address.
  3. If the signer is wrong, change who signs rather than voiding and starting over. See changing who signs.
  4. If terms change after sending, send a new version so nobody signs an outdated document. See sending a new version.

On site, on a tablet

Subcontractors often sign from a site office or a vehicle. The signing page works in a browser on phones and tablets with nothing to install. If a subcontractor is at your office or site and you want the contract signed then and there, in-person signing lets them sign on your device. See in-person signing.

Keeping the record straight

Once everyone has signed, the signed PDF carries an audit certificate showing who signed and when, plus a verification ID anyone can check at the public verify page. Make sure the executed copy is the one your team works from, rather than an earlier unsigned draft that happens to be in someone's downloads folder.

Variations and change orders

The same discipline applies to changes during the job. Decide whether changes are signed through the same process, who approves them, and how they are named so they can be matched to the original commitment. Treat a significant variation like a new contract: right signer, right order, reminders on, executed copy filed.

A note on formality

In Canada, federal and provincial electronic commerce laws generally give electronic signatures the same effect as handwritten ones for most business documents. The documents that are excluded vary by province, and often include wills, powers of attorney and some land transfers. Check with your adviser which of your documents can be signed electronically. Documents that must be sworn, notarized or witnessed by a qualified person need extra formality, and SignAndGo witnessing is not a substitute for that.

More

Read about the Procore integration and construction, or email privacy@myandgo.ai.

Frequently asked questions

What if I sent the subcontract to the wrong person?
You can change who signs on an envelope rather than starting again. Check the status first: an unopened envelope often points to the wrong address.
Can the project manager get a copy without signing?
Yes. Add them as a CC recipient and they receive the completed copy.
Can a subcontractor sign on site?
Yes. The signing page works in a browser on phones and tablets, and in-person signing lets them sign on your device.